Per-OEM NACS transition tracker — when each automaker ships native J3400 and how to Supercharge today
Last updated:
Since Ford's May 2023 announcement, every major automaker selling EVs in North America has committed to the NACS / SAE J3400 connector. The transition runs along two tracks: an adapter program for current CCS1 vehicles (so existing owners can Supercharge) and a native NACS inlet on new vehicles built from MY2025–2027. This page tracks where each OEM is on both tracks.
- Native NACS (factory port)
- Adapter (CCS1 + adapter to Supercharger)
- First-event marker
- Today
Why the timeline is staggered
Tesla open-sourced its connector design in November 2022 and SAE finalized it as J3400 in December 2023. Automakers needed 18–36 months to retool plants, redesign harnesses, and ship factory-built NACS inlets — which is why even early committers (Ford, GM, Rivian) ship adapters first and native inlets later.
Supercharger access opens in two waves per OEM: (1) adapter-only access on existing CCS1 vehicles, gated by a software update to the car and Tesla-side onboarding of the OEM, and (2) native-inlet access on new builds. V3 and V4 Superchargers are the only stalls that accept third-party vehicles via adapter; the older V2 fleet remains Tesla-only.
The first three OEMs to ship adapters in 2024 were Ford (February), Rivian (March), and General Motors (delayed from spring to fall). Hyundai / Kia / Genesis followed in early 2025, then the European brands (Mercedes, BMW, Mercedes, VW Group) in Q2 2025, and the Japanese brands (Toyota / Lexus / Subaru) in late 2025 / early 2026.
How to read this table
Adapter status
- ShippingAdapter is in customer hands today (dealer-distributed or direct-mail).
- AnnouncedAdapter committed and dated; not yet broadly distributed.
- LimitedAdapter exists but constrained — limited quantities or specific models only.
- Native — no adapterTesla — no adapter needed for Supercharger access.
- NoneNo adapter program (typically because the OEM doesn't sell BEVs in NA today).
Supercharger access
- Open (native)Native plug — drive up, plug in, charge.
- Open via adapterOpen on V3+ Superchargers via the OEM-supplied adapter.
- Pilot onlyPilot or partial access — fleet, regional, or beta testing only.
- Not availableNo Supercharger access today (OEM not enrolled in the Tesla program).
Per-OEM rollout — adapter status, native NACS year, and Supercharger access
| OEM | Earliest native NACS | Adapter status | Adapter offer | Supercharger access | Key models | Notes | Updated |
|---|---|---|---|---|---|---|---|
| Tesla | Native since 2012 (NACS / J3400 inlet on all US models) | Native — no adapter | No adapter needed for Supercharger. Tesla sells a CCS1→NACS adapter for non-Tesla DC stations. | Open (native) | Model S, 3, X, Y, Cybertruck | Baseline. All US Tesla vehicles ship native NACS. Tesla also pushed the SAE J3400 standardization (open-sourced 2022, finalized 2023) that everyone else is now adopting. | |
| Ford | MY2025 (rolling — F-150 Lightning, Mustang Mach-E, E-Transit) | Shipping | Ford Fast Charging Adapter (CCS1→NACS). Complimentary-adapter promotion ended after Ford shipped ~140,000 units to early Mustang Mach-E / F-150 Lightning owners. Adapter is now $200 USD on the Ford accessory store; access roughly 29,000+ NACS-enabled Superchargers in the US + Canada. | Open via adapter | F-150 Lightning, Mustang Mach-E, E-Transit | First non-Tesla OEM to gain Supercharger access via adapter (Feb 2024). Adapter is V3+ Supercharger compatible; older V2 Superchargers stay Tesla-only. | |
| GM (Chevrolet, GMC, Cadillac) | MY2025 (Equinox EV refresh, Silverado EV later trims) → MY2026 broad rollout | Shipping | GM-supplied NACS DC adapter for Ultium EVs, $225 USD via brand mobile apps (Chevrolet / Cadillac / GMC). No free-promo window — adapter has been paid since launch. | Open via adapter | Silverado EV, Sierra EV, Blazer EV, Equinox EV, Cadillac Lyriq, GMC Hummer EV | Adapter delayed from announced Spring 2024 to late summer / fall 2024. Native NACS inlet starts with the 2026 Cadillac Optiq and rolls across all future GM EVs (including the new Chevy Bolt), with broad Ultium coverage in MY2026. | |
| Rivian | MY2025 (R1S, R1T second-gen). All MY2026 R1 trims ship native NACS; R2 ships native NACS from launch (port on rear driver's-side fender, matching Tesla placement). | Shipping | Rivian-branded CCS1→NACS DC adapter; ~$225 USD via Rivian Gear Shop. MY2026 Quad-Motor R1 trims ship with a complimentary CCS DC adapter for non-Tesla networks. | Open via adapter | R1T, R1S (2nd-gen, MY2025+), R2 (2026 launch) | Supercharger access enabled March 2024. Second-gen R1 platform (built late 2024 / MY2025) was the first Rivian with a factory NACS inlet. Rivian began retrofitting NACS handles to its own Adventure Network in July 2025, starting with flagship Charging Outposts (Joshua Tree, Yosemite, the Hamptons), and is rolling out tap-to-pay terminals + underground conduits to scale ahead of R2 customer deliveries. | |
| Hyundai / Kia / Genesis | MY2025 (Ioniq 5 US-built refresh) → MY2026 (Ioniq 9, EV9 refresh, Kia EV3, others) | Shipping | Free NACS DC adapter for owners who purchased / leased a non-NACS Hyundai / Kia / Genesis EV on or before 31 January 2025. Requested via MyHyundai / Kia Connect / Genesis owner portals (shipping included), distributed from Q1 2025. 2025 Ioniq 5 N + earlier Ioniq 5 are eligible; standard 2025 Ioniq 5 trims ship native NACS. | Open via adapter | Ioniq 5, Ioniq 6, Ioniq 9, EV6, EV9, GV60, GV70 Electrified | Hyundai / Kia E-GMP platform supports 800 V; through a NACS adapter, charging is capped at NACS-handle 500 V (still ~125 kW peak on V3 / 250 kW on V4 Superchargers). | |
| Honda / Acura | MY2026 (Honda 0 Series, Acura RSX EV). Prologue / ZDX stay CCS1 for full lifecycle (GM-built). | Shipping | Honda-approved NACS-CCS DC fast-charging adapter for Prologue / ZDX owners. Announced March 2025, available June 2025 via Honda / Acura dealers + Honda DreamShop. MSRP $225 USD; no free-promo phase. | Open via adapter | Prologue, ZDX (current GM-built), 0 Series Saloon / SUV (upcoming Honda-built) | Honda's own 0 Series (2026+) is the first Honda-engineered EV with native NACS. Sony Afeela JV separately uses CCS1 at launch in North America. | |
| Stellantis (Jeep, Dodge, RAM, Chrysler, Fiat) | MY2026 (Jeep Wagoneer S, Recon; RAM 1500 REV); Dodge Charger Daytona EV adapter-only at launch. | Announced | Supercharger integration announced 18 November 2025; access opens early 2026 in North America (2027 in Japan / South Korea). Adapter program details for current Stellantis BEVs to be shared closer to launch. | Open via adapter | Jeep Wagoneer S, Jeep Recon, RAM 1500 REV, Dodge Charger Daytona EV | STLA Large platform underpins the first wave. Stellantis was the last major US automaker to publicly commit to NACS (Nov 2023) — rollout timing reflects the late start. | |
| Nissan / Infiniti | MY2026 next-gen Leaf (built at Nissan Sunderland, UK from 2026) is the first Nissan with a factory NACS port for NA. Current MY2023–25 Ariya remains CCS1 (built in Tochigi, Japan) and uses the Nissan adapter for Supercharger access. | Shipping | Nissan-supplied CCS1→NACS DC adapter for MY2023+ Ariya owners — $235 USD via Nissan dealers or parts.nissanusa.com. Nissan initially signalled a complimentary program for existing owners but reversed to a paid retail offer. Supports the Ariya's full 130 kW peak. CHAdeMO Leaf owners have no Nissan-approved CHAdeMO→NACS path; the legacy Leaf cannot use Tesla Superchargers. | Open via adapter | Ariya (CCS1 + adapter), Leaf (CHAdeMO legacy — no Supercharger path), 2026 Leaf gen-3 (native NACS, UK-built) | Nissan was the first OEM to ship a CHAdeMO bidirectional adapter (Leaf-to-Home, 2012). Smyrna, TN Leaf assembly ended mid-2025; the next Leaf moves to Sunderland, UK, which means it loses US $7,500 federal tax-credit eligibility but adopts native NACS. Infiniti's QX Inspiration-based EV remains a concept — no firm NA launch date yet. | |
| Toyota / Lexus / Subaru | MY2026 bZ (refreshed Toyota bZ, on sale in the US from October 2025 with a native NACS inlet); next Lexus RZ, Subaru Solterra next-gen follow. | Shipping | Complimentary NACS-CCS adapter for MY2023–25 Toyota bZ4X owners — letters mailed from November 2025 directing owners to a dealer for the adapter. MY2026 bZ ships with no adapter required. | Open via adapter | bZ4X (refresh), Lexus RZ, Subaru Solterra, upcoming Toyota / Lexus dedicated BEV platform (Arene OS) | Toyota was a late mover on EV strategy generally. The Arene-OS-based next platform (announced 2024) is the first to ship factory NACS across all three brands. | |
| BMW / Mini | BMW i5 (US production) switches to a native NACS port from March 2026 production onward; MY2026 Neue Klasse (iX3 sedan, iX5 SUV) launches native NACS; current iX / i4 / i7 stay CCS1 + adapter. | Shipping | CCS1→NACS DC adapter for BMW Group US EV owners. March 2026 production i5s ship bundled with both J1772→NACS (AC) and CCS1→NACS (DC) adapters; pre-March owners must purchase approved adapters separately. Existing iX / i5 owners also receive a Remote Software Update unlocking NACS Partner Supercharger compatibility. | Open via adapter | iX, i4, i5, i7, i5 Touring (where sold), Mini Cooper SE (CCS1 in NA) | Neue Klasse is BMW's first ground-up EV platform (800 V, native NACS for NA, CCS2 for EU / CN / KR). Cross-brand Mini stays CCS1 until next-gen. | |
| Mercedes-Benz | MY2026 GLC EV (Spring 2026 launch, NACS port standard for the US; imported initially with US Tuscaloosa production from late 2027). MY2026 EQS / EQE / EQS SUV / EQE SUV / G 580 EQ ship with the Mercedes NACS adapter included. | Shipping | Mercedes-Benz-approved CCS1→NACS DC fast-charging adapter, $185 USD MSRP via Mercedes-Benz USA dealers and the MB Connectivity Store. MY2026 Mercedes EVs come bundled with the adapter; pre-MY2026 owners (EQB, EQE, EQS, G 580) purchase it separately. | Open via adapter | EQS, EQE, EQS SUV, EQE SUV, G 580 EQ (all CCS1 + adapter); GLC EV (first Mercedes with factory NACS port for NA) | Mercedes is also building its own Supercharger-class HPC network (Mercedes-Benz Charging Network, NACS-equipped) — first US stations opened in 2024. The 2026 GLC EV is built on the MB.EA platform (800 V, native NACS for NA only — Europe stays CCS2). | |
| Volvo / Polestar | Volvo EX60 (debuted May 2026, US deliveries H2 2026) is the first Volvo with a factory NACS port. Other current Volvo / Polestar models (EX90, EX40, EC40, ES90, Polestar 3 / 4) remain CCS1 + adapter for now; native NACS rolls into MY2027 refreshes. | Shipping | Volvo CCS1→NACS DC fast-charging adapter, $230 USD MSRP via Volvo retailers (launched 18 November 2024). MY2025 EX90 / EX40 / EC40 ship with the adapter as standard equipment; pre-MY2025 Volvo / Polestar owners purchase it separately. EX30 deliveries to NA remain disrupted by the 100% tariff on China-built EVs, so the US-market EX30 NACS rollout is still TBD. | Open via adapter | Volvo EX60 (native NACS), EX90, EX40, EC40, ES90 (CCS1 + adapter); Polestar 2, 3, 4 (CCS1 + adapter); EX30 (NA delivery uncertain due to tariffs) | Geely-owned, but US-market Volvo / Polestar follow the broader Western OEM NACS schedule. The EX60 — built on the SPA3 / Volvo Cars-only platform — is the first Volvo engineered around a factory NACS port (rear driver's-side). Earlier coverage that named the EX30 as Volvo's first native-NACS model proved premature once US tariff-driven import limbo blocked the EX30 rollout. | |
| Volkswagen Group (VW, Audi, Porsche, Scout) | MY2025 limited (Scout Terra / Traveler — native NACS at launch); MY2026 broad rollout VW ID. + Audi PPE. | Shipping | VW ID.4 / ID.Buzz NACS DC adapter available via VW dealers + parts.vw.com from 18 November 2025; MSRP $200, with a $100 rebate for original MY25 ID.4 / ID.Buzz owners. Adapter ships standard with every MY2026 VW EV. Audi / Porsche adapter programs follow on brand-specific timelines. | Open via adapter | VW ID.4, ID.Buzz; Audi Q4 / Q6 / Q8 e-tron, e-tron GT; Porsche Taycan, Macan EV; Scout Terra / Traveler | Scout Motors (VW-owned reboot) leapfrogs the rest of VW Group by shipping native NACS at brand launch. PPE platform (Audi / Porsche) gets NACS hardware in MY2026 vehicles. | |
| Lucid | Lucid Gravity ships native NACS (first deliveries December 2024 — making it the first non-Tesla US-sold EV with a factory NACS port). Native Tesla Supercharger access opened 31 January 2025. Lucid Air retains CCS1 through MY2026. | Shipping | Lucid Gravity ships with Lucid-supplied CCS1→NACS DC and J1772→NACS AC adapters bundled (Lucid's CCS adapter is rated 500 A at 1,000 V — the highest-rated such adapter Lucid claims is available). Air owners (CCS1 port) receive the same Lucid-approved CCS→NACS DC adapter for Supercharger access; first units shipped Q1 2025. | Open via adapter | Lucid Air (CCS1 + adapter), Lucid Gravity (native NACS) | Lucid was an early NACS commit (2023). Gravity charges at up to 400 kW peak on its 123 kWh / 900 V architecture and quotes a 450-mile EPA range. Supercharger sessions are still capped by V3 (~250 kW) / V4 cabinet limits — Gravity hits full headline rates only at non-Tesla 1,000 V DC stations. | |
| Mazda | 2027+ — Mazda's first dedicated in-house BEV platform debuts in 2027, and Mazda has confirmed NACS for BEVs launched in Japan from 2027. A North American NACS commitment has not been formally announced. Interim BEVs (Mazda 6e sedan, CX-6e SUV — both Changan-sourced from China) target Europe / Japan; neither has been confirmed for the US. | Announced | No adapter program in North America. Current Mazda lineup in NA (CX-90 PHEV, CX-70 PHEV, MX-30 discontinued) does not include a DC-fast-charge BEV. Any NACS adapter offering will follow the first BEV that Mazda actually ships to NA. | Not available | MX-30 (legacy, discontinued NA), Mazda 6e / CX-6e (Changan-sourced, CN/EU only), upcoming dedicated-platform Mazda BEV (2027+) | Mazda has minimal NA BEV presence today. The 2025 Japan-market NACS commitment (Mazda press release, May 2025) covers Japan-sold BEVs from 2027. Mazda's separate manufacturing JV with Toyota (Huntsville, AL — building the hybrid CX-50) is not currently a BEV / NACS pathway. | |
| BYD / Chinese OEMs (NA outlook) | N/A — Chinese OEMs remain locked out of the US passenger market by the 100% Section 301 tariff on China-built EVs (in effect since August 2024) and the BIS Connected Vehicles Final Rule, which became effective 17 March 2025 and prohibits Chinese-supplied Vehicle Connectivity System / Automated Driving System hardware and software from MY2027 (software) and MY2030 (hardware) onward. | None | No retail US adapter program. BYD electric bus / forklift programs use proprietary or CCS1 hardware case-by-case. | Not available | BYD Atto 3, Han, Seal (CN / EU markets only); GAC Aion / NIO / Xpeng / Zeekr (not sold in NA) | Tracked here to underscore the asymmetry: Chinese OEMs dominate global volume but are absent from the NACS transition story. BYD has announced plans for a Mexico plant; production has not yet started and any Mexico-built BEV destined for the US would still need to clear the Connected Vehicle Rule. In Mexico (where the US tariff does not apply) some Chinese BEVs ship with CCS1. |
Caveats and gotchas
- V3 / V4 Superchargers only. The older V2 fleet (~10% of Tesla's NA stalls in 2026) does not accept third-party vehicles, even through an adapter — this is a Tesla-side limitation, not an OEM one.
- Stall layout matters. Most Superchargers are designed for Tesla's left-rear charge port. A long-nosed Lightning or wide Hummer EV can block neighboring stalls; some sites have been re-engineered with pull-through bays for non-Tesla EVs (notably Magic Dock pilots).
- Charging speed through an adapter is software-capped at the Supercharger's per-stall ceiling (≤ 250 kW on V3, 325 kW on V4) and at the adapter's voltage cap (NACS handle = 500 V). An 800 V vehicle gets less peak power on a Supercharger than on a 350 kW CCS1 station; on V4 the gap narrows substantially.
- An OEM-supplied adapter is the trust signal. Third-party CCS1→NACS adapters from Amazon / AliExpress are usually NOT SAE J3400 / UL 2252 dual-active-interlock certified. Tesla blocks adapters lacking the interlock handshake — using a non-certified adapter risks both the charge session and the warranty.
- Native-NACS vehicles still need a J1772→NACS pigtail for L2 home / workplace charging — most J1772 stations will remain in service for a decade-plus and dwarf the NACS L2 footprint until the late 2020s. The pigtail is included with every native-NACS vehicle.
- MY transitions are noisy. Within a single MY, a given nameplate can switch from CCS1 to NACS mid-production based on plant (Mexican-built models often lag US-built models by 6–12 months). Confirm against the VIN-specific build sheet before assuming.
Related tools
- NACS / J3400 connectorPin layout, signaling stack, AC/DC ceilings, and OEM model-year rollout details for the SAE J3400 inlet that all the OEMs above are transitioning to.
- Magic Dock vs CCS1→NACS adapterTwo paths to Tesla Supercharger access for non-Tesla EVs: station-side sleeve (Magic Dock) vs vehicle-side adapter. When to pick which.
- Tesla Supercharger generations — V1 / V2 / V3 / V4Max kW, cable length, native CCS support, Magic Dock availability, deployment regions, and non-Tesla access path per Supercharger generation.
- Network plug compatibilityPer-network cheatsheet — NACS / CCS1 / J1772 status, max kW, and adapter notes for Tesla Supercharger, EA, EVgo, ChargePoint, and Ionna.
- Connector adoption by regionPer-region market share for J1772, NACS, CCS1, CCS2, CHAdeMO, Type 2, GB/T — plus approximate public DCFC port counts for NA, EU, CN, JP, KR, AU+NZ.
- Cold-weather charging deratingWhy cells slow down in winter — lithium plating, NMC vs LFP, per-OEM preconditioning, and an ambient-temp DC fast-charge speed table.
- What connector does my EV use?Pick your make, model, and year to see your native port, working adapters, and Tesla Supercharger access.